Pump Groups in a 2,000 m² Production Hall in Poland

Project Overview

The heating system for a production hall in Rokietnica (Wielkopolskie Voivodeship, Poland) was installed using Watts FlowBox pump groups.

System Details

The heating system was implemented in a newly constructed 2,000 m² warehouse hall using Watts heating components. The installation includes HK25/HKM25 pump groups and the VB25/32-4 boiler manifold (part no. 10026672).

A 4-circuit VB25/32 manifold distributes heat across four separate circuits, supplying hall heaters and office room heaters. The system has a total heating capacity of 69 kW, powered by a pellet boiler. The pump groups, together with the boiler manifold, operate in combination with a 1,000-liter heat buffer. This setup is fully insulated, minimizing heat loss and improving energy efficiency.

The installation was carried out by Baseco (Rokietnica, Poland), with fittings supplied by the distributor TG Instalacje Dąbrowa.

Location

Rokietnica, Poland

Application

Industrial buildings

Construction Time

November 2024